Search
Agadir.jpg

Oued River Crossing

Visser & Smit Hanab was contracted for the crossing of the Oued river as part of the construction of a wastewater pipeline.    A 250 ton drill rig was used for the 370 meter river crossing of the 1200 mm PE pipeline.